15. SEASIDE SOCIAL CLUB

Port Talbot in West Glamorgan boasts a modern purpose built club building housing the Seaside Social and Labour Club. Formed in 1963 to satisfy the needs of the local population for a focus to their social activities, the club has gone from strength to strength. The club building, opened in 1965 houses all the facilities one could want, allowing this thriving organisation to grow to its present size, where the membership exceeds two and a half thousand.

The club building is open every day in the year, from 11.30 in the morning until 11 at night, and provides a wide range of activities for the local population, from where the club membership is predominantly drawn. The multipurpose concert hall is large enough to cater for 450-500 people for a concert, or around 350 for a dinner dance, also having a stage at one end, and a large screen at the other for showing films. On the ground floor is a comfortable lounge and other facilities.
Seaside Social Club Concert Hall

The resulting design proposed that the air conditioning should be provided by electric heat pumps, giving cooling during the summer and heating in the winter, together with fan driven smoke extraction. These proposals were accepted not only for the concert hall, but also the ground floor lounge. Having the flat roof provided an ideal location for the heat pumps, with 6 DAIKEN SKYAIR units providing a combined output of 66kW of cooling and 70kW of heating for the concert hall, the lounge bar being fed from two units mounted on the back wall of the building, with a capacity of 20kW of cooling and 22kW of heating.

Each heat pump feeds its own separate ceiling mounted unit within the building, directing the treated air downwards and outwards, providing full circulation of the air throughout the room.

Seaside Social Club Roof Mounted Air Conditioning Units

In line with most 60's built buildings of this type, the club building has a flat roof. The common problems of heat gain during the summer and heat loss in the winter gave varying comfort levels in the first floor concert hall. When looking to tackle this problem, the club also decided that the air quality within the building left much to be desired, and RACS were asked to provide a solution to both of these problems.

 


"The air quality has improved beyond belief. One of our lady members, who has asthma, used to view a visit to the club with fear, but now looks forward to her visits. RACS have provided a complete solution to our problems."

Eurof Griffiths
Secretary

corgi.GIF (5939 bytes)

[ Home | Refrigeration | Air Conditioning | Catering Equipment | Services | Case Studies | Contact Us ]

RACS LIMITED, UNIT 1, BENSON WAY, VALLEY WAY, 
SWANSEA ENTERPRISE ZONE, SWANSEA,  SA6 8QP
TEL 01792 795222
FAX 01792 775782